Construction work has started on a
£14.7m scheme to improve a notorious accident blackspot in South Yorkshire.
More than 30 people have been injured on the A57 at Todwick, near Rotherham, between 2006 and 2011.
The scheme includes a dual carriageway on a part of the 2.5km stretch of
road, crossroads and a roundabout.
A reduced speed limit is in operation until the work is finished. The project
is expected to be completed by early 2014.
The council said the new road scheme would also reduce traffic congestion and
delays.
Councillor Gerald Smith, from Rotherham Borough Council, said: "This road
carries high levels of traffic so it needs to be as safe as possible. It has
been troubled by road safety and congestion problems for years."
"It is also vital for the continued re-generation within the Dinnington
area."
The council said it would maintain access to residents properties while the
construction is taking place.